QatarEnergy announces awarding $10 billion EPC contract for North Field South project

image is QE NFS TECHNIP

North Field South, together with the North Field East (NFE) project, will increase Qatar’s LNG production capacity from the current 77 MTPA to 126 MTPA.

QatarEnergy has announced the award of the engineering, procurement, and construction (EPC) contract for the North Field South (NFS) project, which comprises two LNG mega trains with a combined capacity of 16 million tons per annum (MTPA).

NFS, together with the North Field East (NFE) project, will increase Qatar’s LNG production capacity from the current 77 MTPA to 126 MTPA. QatarEnergy holds a 75% interest in the NFS project and has already signed partnership agreements with TotalEnergies, Shell, and ConocoPhillips for the remaining 25%.

The announcement was made during a ceremony held to mark the award of the EPC contract for the two LNG trains and associated facilities with a joint venture of Technip Energies and Consolidated Contractors Company (CCC).

The contract was signed by His Excellency Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of QatarEnergy, Mr. Arnaud Pieton, the President of Technip Energies, and Mr. Oussama El Jerbi, CCC Managing Director – Qatar, in the attendance of Sheikh Khalid bin Khalifa Al Thani, the Chief Executive Officer of Qatargas, and senior executives from QatarEnergy, Qatargas, Technip Energies and CCC.

Commenting on the award of the EPC contract, HE Al-Kaabi said: “QatarEnergy is proud to announce yet another significant milestone in the world’s largest LNG project, reinforcing our commitment to meeting the global demand for Natural Gas.”

He added: “The NFS project is a unique development that minimizes its environmental footprint by design. It includes one of the largest CO2 capture and sequestration facilities and constitutes an important step towards achieving QatarEnergy’s target of more than 11 MTPA of CO2 capture and sequestration by 2035."

The EPC contract’s value is around $10 billion, and its scope covers the construction of two mega LNG trains with a capacity of 8 MTPA each, with associated facilities for gas treatment, natural gas liquids recovery, as well as helium extraction and refining within Ras Laffan Industrial City, QatarEnergy said.

In addition to the carbon capture and sequestration facilities, the environmental attributes of the NFS project also include importing a significant portion of the project’s electrical power requirements from the grid in the form of renewable solar power, which will be generated at QatarEnergy’s solar power facilities currently under construction in Ras Laffan Industrial City.

It also includes a 'jetty boil-off gas' recovery system, which will help reduce greenhouse gas emissions. The project will also conserve five million cubic meters of water per year by recovering 75% of the plant's tertiary water. Nitrogen Oxides (NOx) emissions will also be minimised through the application of enhanced Dry Low NOx technology.

KEEPING THE ENERGY INDUSTRY CONNECTED

Subscribe to our newsletter and get the best of Energy Connects directly to your inbox each week.

By subscribing, you agree to the processing of your personal data by dmg events as described in the Privacy Policy.

Back To Top